Description
Due to the increase in demand of sea water from the nearby newly developed areas, station flow rate of existing Cheung Sha Wan Salt Water Pumping Station had to be increased accordingly. Meanwhile, it was required to uprate the existing electro-chlorination system so as to maintain sufficient residual chlorine inside the sea water supply system. After uprated, the maximum chlorine capacity of the new electro-chlorination system is 54 kg/hr.