Castle Peak Power Station & Black Point Power Station

Regions
Hong Kong

Sector
Private

Business

Industries
Sustainability

Client
CLP Power Hong Kong Limited

Location
Castle Peak Power Station & Black Point Power Station

Type of Contract
Direct Contract

Completion Date
2023

Description
Design and Installation of Demineralized Water Production System Works. The project planned to design and install a new water treatment system for production of demineralized water to the boilers and gas turbines at Castle Peak Power Station (CPPS) and Black Point Power Station (BPPS). For CPPS, this project will be implemented in two phases, and total production of demineralized water will be 2000m3 per day. For BPPS, the project scale is larger than CPPS and will produce demineralized water in 3000m3 per day from our new system. The project adopts the advanced membrane process technologies including Ultrafiltration (UF), Reverse Osmosis (RO) and Electrodeionization (EDI) in order to remove free chlorine and filter out pollutants from town water to the acceptable level for the power generation use. At the same time, we had adopted MiC technology for the construction of the systems for this project.

All projects